Key Facts
Location: Basingstoke, Hampshire
Contract Value: £4M (Civils)
Project Overview
SMA was appointed by Barratt Homes (Southern) to deliver the civil engineering design for Phase 2 of the Park Prewett development in Basingstoke, comprising 285 residential dwellings. The project required detailed design of below-ground drainage and external works, including integration with existing infrastructure delivered by a neighbouring developer.
Situated on a steeply sloped site, the scheme required advanced coordination of levels, drainage, and access, while meeting planning, environmental, and building regulation requirements.
Key Challenges
SMA provided full civil engineering consultancy and coordination services, including: